Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel
Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel
Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel
Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel
Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel
Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel
Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel
  • Load image into Gallery viewer, Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel
  • Load image into Gallery viewer, Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel
  • Load image into Gallery viewer, Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel
  • Load image into Gallery viewer, Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel
  • Load image into Gallery viewer, Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel
  • Load image into Gallery viewer, Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel
  • Load image into Gallery viewer, Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel

Mazda BT-50 (2020-2024) Fatz Fabrication 4″ Stainless Snorkel

Regular price
$1,363.20
Sale price
$1,363.20
Regular price
$1,420.00
Sold out
Unit price
per 

Tax included. Shipping calculated at checkout.

The clean, smooth lines of the MY2020 Mazda BT50 demand a clean fitting snorkel that compliments the vehicle aesthetic and follows the vehicle body well. Our snorkel fills this brief and looks the part while providing clean, high level air intake for the 4JJ3 engine.

Built in 316 stainless steel, professionally purge welded and finished to a seamless form and either powder coated satin black or polished to a 320 grain finish. With the factory air intake at the front of the factory airbox, there is a need for adaption of the intake location.

We take care of this in the kit with supply of a blanking plate and new entry inlet pipe. supplied with all needed for installation including clear color photo instructions, clear marking template and all items for installation.

Leadtime

 approx. 1-2 weeks from order date to dispatch from QLD Factory